Product details

Description

VOGI DRAIN with DUO Black GRATE 

The DUO shower channel has a double-sided, reversible grate - thanks to which we have a choice of two types of grate finishing. On the one hand, it is made of steel, flat, black finish, after passing the spacers and turning it, it has a place to glue the tile. This solution makes it universal. Product codes: RD70set.BLACK, RD80set.BLACK, RD90set.BLACK

Uses

VOGI Drain with Duo Black grate is suitable to be fitted in shower spaces with preformed slopes. Drain set includes sealing cuff for waterproofing.

Characteristics/Advantages

  • Siphon Ø50 (flow rate up to 56 l/min) easily cleaned from the top with hair catchers, double chamber to prevent clogging
  • Installation height: 62 mm to the flange. The lowest Ø50 siphon on the market. Patented shape.
  • DUO grate (for pasting the tile or after reversing flat brushed).
  • Scandinavian stainless steel - acid-resistant AISI304 + ABS.
  • Advantages of VOGI linear shower drain (youtube.com)

What's in the box

  • Drain channel with siphon
  • DUO grate (for pasting the tile or after reversing flat brushed).
  • Sealing cuff for waterproofing installation
  • Cleaning key
  • Attached mounting feet
  • Adapters from 50mm to 40mm waste pipe (1.5 inch white waste pipe)
  • Fitting instructions

FAQs

Please read our FAQs page to find out more.

How much does shipping cost?

Shipping costs are based on the total weight of your order:

  • Free delivery on orders over €1,000
  • €14.99 for orders 0–30kg
  • €29.99 for orders 30–60kg
  • €44.99 for orders 60–90kg
  • €59.99 for orders 90–120kg etc.

All shipping costs are calculated automatically at checkout.

How long do I have to return an item?

If you change your mind about the Goods when you receive them, you have 14 days after the delivery of the Goods to return the Goods with prior Return’s documentation. However please note that cancellation of bespoke, customised or special-order Goods will not be accepted once your order has been processed online and no returns or exchange will be available for special order Goods.

Which countries do we ship to?

Currently, we only ship to the Republic of Ireland. Unfortunately, we do not yet ship internationally.

Can I buy in bulk?

Yes, we accept Wholesale orders. Please contact us for pricing details and minimum order quantities.

Didn’t find your answer?

Don't hestitate to contact us